Special Issue for the 13th IWA International Specialist Conference

Modeling the e ects of constructed wetland on nonpoint source pollutioncontrol and reservoir water quality improvement


Jonghwa Ham , Chun G. Yoon , Hyung-Joong Kim , Hyung-Chul Kim

DOI:

Received October 07, 2009,Revised January 02, 2010, Accepted , Available online

Volume 22,2010,Pages 834-839

  • Summary
  • References
  • Related Articles
This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improvement at a catchment scale. The experimental field-scale wetland systems (four sets, 0.88 ha each) have been in operation since 2002, where water depth was maintained at 30–50 cm and hydraulic loading rate was at 6.3–18.8 cm/day. The wetland system was found to be adequate for treating polluted stream water with stable removal e ciency even during the winter. The integrated modeling system (modified-BASINS) was applied to the Seokmoon estuarine reservoir watershed and calibrated with monitoring data from constructed wetland, stream, and reservoir. The calibrated integrated modeling system estimated that constructing wetlands on 0.5% (about 114 ha) of the watershed area at the mouth of reservoir could reduce 11.61% and 13.49% of total external nitrogen and phosphorus loads, respectively. It also might improve the nitrogen and phosphorus concentration of the reservoir by 9.69% and 16.48%, respectively. The study suggested that about 0.1%–1.0% of the watershed area should be allocated for constructed wetland to meet specified water-quality standards for the estuarine reservoir at the polder area where land use planning is relatively less complicated.

Copyright © Research Center for Eco-Environmental Sciences, Chinese Academy of Sciences. Published by Elsevier B.V. and Science Press. All rights reserved.京ICP备05002858号-3